Loon River First Nation: Industrial Park Grocery Store
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Loon River First First Nation proposes to construct and operate a new grocery store at the Loon River Industrial Park near Red Earth Creek to supply local demand for local grocery service for nearby indigenous communities. The grocery store will be 850 square meters not including access roads, parking surfaces, and stormwater infrastrucute. The proposed location has been cleared of forest, but has no other improvements. The industrial park is within the Red Earth woodland caribou range; habitat was assessed and determined to be insufficient for woodland caribou and therefore, the species is unlikely to be disturbed.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination | - | March 29, 2023 |
1 | Public Comment Period on Intent to Make a Determination | - | February 8, 2023 |
Contacts
Indigenous Services CanadaJoël Gervais, Environment Officer
630 Canada Place
9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-370-5008
Email: joel.gervais@sac-isc.gc.ca
-
Location
- Loon River Cree Nation (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2023-02-08 -
Proponent
Loon River First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
84314
Nearby assessments
...within 200 kilometres-
Loon Lake Cree Nation Pure Fibre Network Project
Loon River Cree Nation -
Loon River First Nation Bridge Replacement over Loon River
Loon River First Nation -
Loon River First Nation: CU363 Emergency Wastewater System Repairs
Loon River First Nation -
Loon River First Nation Water Treatment Plant Upgrades Design Construction
Loon River First Nation -
Loon River First Nation North Central Corridor Loop Temporary Contractor Yard
Loon River First Nation -
Loon River First Nation: CU344 Main Access Road Upgrade Project
Loon River First Nation -
Loon River First Nation Industrial Park Warehouse
Loon River First Nation -
Woodland Cree CMHC Co-Investment Housing Project - Marten Lake Subdivision (10-Units)
Cadotte Lake -
North Corridor Expansion Project
Highway 88 -
Rogers Communications Inc., new radiocommunications tower (W6238) on Peerless Trout First Nation land, near Trout Lake, AB.
W6238 - Peerless Trout First Nation Land (near Trout Lake) -
North Corridor Expansion Project
Peerless Lake -
Rogers Communications Inc., new radiocommunications tower (W6225) on Peerless Trout First Nation land, near Peerless Lake, AB.
W6225 - Peerless Trout First Nation Land (near Peerless Lake) -
OS-7244 Woodland Cree 226
Woodland Cree 226 -
OS-7239 Woodland Cree 226
OS-7239 -
Woodland Cree 226
OS-7238 -
Atikameg Healing Shelter for Women and Children
Whitefish Lake First Nation -
OS-7245 Woodland Cree Reserve 226
Woodland Cree 226 -
Woodland Cree CMHC Co-Investment Housing Project - Simon Lake Subdivision (21-Units)
Woodland Cree First Nation -
Whitefish Lake Fire Guard Project
Whitefish Lake First Nation 155 -
Wolverine River Lateral Loop (Carmon Creek Section)
Jackpine Lake -
Wolverine River Lateral Loop (Carmon Creek Section)
Carmon Lake -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Kapawe'no Adventure Trail Project
Kapawe'no Adventure Trail Project -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone Cree Nation High School Waterline Project
Wabasca -
Kapawe'no First Nation Echo Prairie Waterline Project
Kapawe'no First Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
ATCO Gas and Pipelines Ltd.: 1088866 Wabasca IR No. 166A Gas Distribution Extension
Bigstone Cree Nation Wabasca IR No. 166A -
Smoky River Wind Project
Municipal District of Smoky River, between Nampa and Falher -
Joussard Harbour Alberta - Routine Maintenance Dredging of the Joussard Harbour at Lesser Slave Lake Alberta - over the next year
Joussard Harbour -
Swan River First Nation Lakefront Development Project
Lesser Slave Lake -
Swan River First Nation Housing Project 2019 (5-Units)
Swan River First Nation -
Sucker Creek Housing Project 2020 (4 Units)
Sucker Creek First Nation -
Three Unit Modular Housing Project
Sucker Creek First Nation -
Bigstone Cree Nation & Hamlet of Sandy Lake - ATCO Gas and Pipelines Ltd.: 1088866 - Gas Feeder and Mains at Wabasca IR No. 166
Bigstone Cree Nation -
Swan River First Nation: Wastewater Lagoon Liner Repair & Sub-liner Drainage Upgrade
Swan River First Nation -
Sucker Creek First Nation Water System Upgrades
Sucker Creek First Nation -
Swan River First Nation Waste Diversion and Recycling Facility
Swan River First Nation -
North Corridor Expansion Project
Highway 741 -
Driftpile Cree Nation Lift Station No. 1 Replacement Project
Driftpile Cree Nation -
Driftpile Cree Nation Housing Project
Driftpile Cree Nation -
Driftpile Cree Nation New Housing Construction Project
Driftpile, AB -
Driftpile Cree Nation Gas Line Connector Project
Driftpile Cree Nation -
DCN 2023 Rapid Housing Project
DCN 2023 Rapid Housing Project -
Sawridge Band Solar Farm Project
Sawridge Band -
Tallcree First Nation Pure Fibre Network Project
Tallcree First Nation -
Telus Communications Inc., new radiocommunications tower (AB000853) on Tall Cree Indian Reserve 173-1
Telus Communications Inc., new radiocommunications tower (AB000853) on Tall Cree Indian Reserve 173-1 -
North Corridor Expansion Project
Township Road 940 -
Telus Communications Inc., new radiocommunications tower (AB000851) on Tall Cree Indian Reserve 173A-1
Telus Communications Inc., new radiocommunications tower (AB000851) on Tall Cree Indian Reserve 173A-1 -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray