Cold Lake First Nations LTE Fixed Wireless Upgrade Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Cold Lake First Nations (CLFN) LTE Fixed Wireless Upgrade Project (the "Project") will install Long Term Evolution (LTE) fixed wireless equipment on both existing and new towers located on all three of CLFN's populated reserves. The Project will provide LTE wireless broadband services to approximately 600 homes at CLFN and other residences and businesses outside of CLFN that seek improved internet connectivity. The LTE equipment will replace CLFN's dated WiMAX technology.
The Project includes three phases:
Phase 1 will upgrade three existing towers with new LTE radios and associated hardware and equipment. In this phase, there will also be upgrades to 40 customer premise equipment (CPE) radios to allow access to the new services and enable access to over 300 new users. One tower will increase in height from 64 ft to 80 ft to improve coverage;
Phase 2 will upgrade two existing towers with new LTE radios and associated hardware and equipment. In this phase, there will be upgrades to another 40 CPE radios to allow access to the new services and enable access to over 200 new users. Both towers will increase in height from 64 ft to 80 ft; and
Phase 3 will install two new 80 ft towers with new LTE radios, new backhaul radios and associated hardware and equipment.
The Project supports the Truth and Reconciliation Commissions' Calls to Action for Indigenous people and will provide better internet access to all community members, which will allow them to engage in the digital economy; allow for community members to better access the internet for online training opportunities; attract businesses that currently rely on stable internet access and higher bandwidth, currently not available in most areas in the community; support CLFN's IT based emergency response and emergency preparedness efforts; and increase overall quality of life for community members.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
2021-10-18 – Innovation, Science and Economic Development Canada has determined that the proposed project is not likely to cause significant adverse environmental effects. .
Participate
Contacts
Innovation, Science, and Economic DevelopmentSteven Seltenrich, Manager, STS-Western Region
9700 Jasper Avenue NW, Room 725
Edmonton, Alberta T5J 4C3
Telephone: 780-566-8591
Email: steven.seltenrich@canada.ca
-
Location
- Existing Tower 1: Cold Lake (Alberta)
- Existing Tower 2: Cold Lake (Alberta)
- Existing Tower 3: Cold Lake (Alberta)
- Existing Tower 4: Cold Lake (Alberta)
- Existing Tower 5: Cold Lake (Alberta)
- New Tower 1: Cold Lake (Alberta)
- New Tower 2: Cold Lake (Alberta)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2021-06-09 -
Proponent
Cold Lake First Nations -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
81692
Nearby assessments
...within 200 kilometres-
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
Building Demolition and Ramp Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Department of National Defence Future Fighter Capability Project - Demolition of Hangar 6 and Construction of New Fighter Squadron Facility
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation Project)
Cold Lake First Nation -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Powwow Arbour Construction
Pierceland -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
WATERHEN I.R. 130 -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Ministikwan Subdivision Development
Ministikwan IR 161 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 3) -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161A -
Kehewin Lift Station Project
Kehewin Cree Nation -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Kehewin Cree Nation Transfer Station
Kehewin Cree Nation -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Waskonaman Hill Gravel Project
Frog Lake First Nation -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 1) -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 2) -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
EAGLES LAKE I.R. 165C -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 1) -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 3) -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Dore Lake Wharf Removal
Dore Lake -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
LA PLONGE I.R. 192 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Lamont Railcar Storage Project
Northwest of Lamont -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Ryley Facility Expansion Project
Ryley -
Astotin Lake Dock Replacement
Elk Island National Park -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Ryley Biomedical Waste Incinerator Project
Ryley -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Redwater Facility Rail Yard Project
Near Redwater -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
TransCanada Energy East Pipeline Project
Hardisty -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
Enbridge Line 3 Replacement Program
Hardisty -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan