Fraser Mills Foreshore Improvements

Beedie Fraser Mills LP are proposing foreshore improvements to an approximate 600 metre length of waterfront on the north side of the Fraser River in Coquitlam, known as Fraser Mills. The proposed works within the port authority jurisdiction relate to landscaping, storm water, and the existing wharf. The proposed upland residential development (the Fraser Mills Waterfront Village development site), is within the jurisdiction of the City of Coquitlam, and does not form part of this application review.  

The proposed landscaping works along the foreshore include the installation of sections of an asphalt pathway, a one metre high wooden fence along the top of the rip rap bank and landscape planting. Also proposed are improvements to an alluvial fan at the location of the historic confluence of Como Creek and the Fraser River, to create a storm water outfall. These works would include vegetation clearing, as well as excavation of existing rip rap and historic fill to approximately 4.5 metres, and construction of a drainage channel lined with a granular filter/bedding layer, topped with infilled riprap and boulders. Habitat planting is proposed along the east and west banks of the alluvial fan outfall. Improvements are also proposed to an existing wharf structure within the project area. These works would include the replacement of the existing timber deck with a new timber deck, handrail and lighting, and the installation of a 91 metre long sheet pile wall.

The works are anticipated to commence in Spring/Summer 2021 and would take approximately six months to complete.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

End of Public Comment Period

The public comment period on the project is closed. The Vancouver Fraser Port Authority is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects..

List all records

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, BC V6C 3T4
Email: per@portvancouver.com


  • Location

    • Fraser Mills Foreshore Improvements (British Columbia)
  • Project Type

    • Other, not otherwise specified
    • Maintenance activities (fences, walls)
  • Status

    In progress
  • Start Date

    2020-09-24
  • Proponent

    Beedie Fraser Mills LP
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    81009