Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Road washed out spring 2020 and 3 ft in diameter culvert was damaged. Road has been temporarily filled in to allow access. Road will be excavated, old culvert removed and new installed.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
25 July 2020 - The public comment period on the project is closed. Parks Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New Project Being Assessed by Parks Canada - Public Comments Invited 25 June to 25 July, 2020 | - | June 25, 2020 |
Contacts
Wood Buffalo National Park149 McDougal Rd
Box 750
Fort Smith, Northwest Territories X0E 0P0
Telephone: 867-872-7960
Email: rescon-ftsmith@pc.gc.ca
-
Location
- Wood Buffalo National Park (Alberta)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
In progress -
Start Date
2020-06-25 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
80807
Nearby assessments
...within 200 kilometres-
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Peace Point Water Survey of Canada Hydrometric Station Shelter Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Mikisew Peace Point Power Plant Solar Addition
Mikisew Cree First Nation -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Clairière de plantes baccifères au terrain de camping du lac Pine, parc national du Canada Wood Buffalo
Wood Buffalo National Park -
Culvert Replacement and Repair at km 41 Hay Camp Road
Wood Buffalo National Park of Canada -
Hay Camp Road (km 20) Culvert Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Smith's Landing First Nation Residential Housing Development Project
Smiths Landing First Nation -
Smith's Landing First Nation Phase 1(a) Housing Development
Smiths Landing First Nation -
L150 Anchor Inspection and Repair
Wood Buffalo National Park of Canada -
NTPC L-150 Anchor Inspection and Rehabilitation Project, Highway 5
Wood Buffalo National Park of Canada -
Wood Buffalo National Park Highway Asphalt Surface Treatment
Wood Buffalo National Park -
Frontier Oil Sands Mine Project
Fort McKay -
Pierre River Mine Project
Fort McKay -
Sandhills Substation Generator Upgrade
Wood Buffalo National Park of Canada -
Sass River / Prebble Creek Embankment Repair and Gabion Installation by the Government of the Northwest Territories
Wood Buffalo National Park of Canada -
Fox Lake School
Fox Lake -
Former Gunnar Mine Site Rehabilitation Project
Gunnar -
Jackpine Mine Expansion Project
Fort McKay -
Fort McKay First Nation K-9 School
Fort McKay First Nation