Registry Search Mobile

Registry Search

Sawridge Band Solar Farm Project

Sawridge Band is proposing to construct and operate a new solar electrical generation facility with the maximum output capacity of 4.95 megawatts (MW) and up to 8.5 gigawatt hours (GWh) per year. The site is 10.1 ha with a target build-able area of the entire site. There will be approximately 18,000 solar panels arranged into approximately 25 arrays.  It is planned to be 99 inverters of 50 kW each and 3, 2 MVA transformers. The electricity generated from the facility will be input into the local electrical grid that is part of Alberta's Interconnected Electric System (AIES).


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

End of Public Comment Period

December 3, 2019 - The public period on the project is closed. Indigenous Services Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Key documents

Key documents
Document Number Document Title File Date
1 Public Comment Period on Intent to Make a Determination - October 30, 2019

List all records

Contacts

Indigenous Services Canada
Stacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, AB T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca


  • Location

    • Sawridge Band (Alberta)
  • Project Type

    • Alternative Energy
  • Status

    In progress
  • Start Date

    2019-10-30
  • Proponent

    Sawridge Band
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80282

Nearby projects

..within 200 kilometres
Date modified: