Sundog Renewable Generating Station Project

Sundog RGS GP Inc., a wholly owned subsidiary of Innergex Renewable Energy Inc., is proposing the construction and operation of a run-of river hydroelectric facility on the Athabasca River located approximately 130 kilometres upstream of Fort McMurray, Alberta. The proposed Sundog Renewable Generating Station Project would have a generating capacity of 135 megawatts. Components would include a new 240 kilovolt transmission line, a spillway to increase the water level in the river, a powerhouse, in-river embankment structures, boat launches, access roads, and ramp fishways.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.


Latest update

February 14, 2018 - The Canadian Environmental Assessment Agency terminated the environmental assessment process of the designated project at the request of the proponent.

List all records

Contacts

  • Impact Assessment Agency of Canada
  • 160 Elgin Street, 22nd Floor
  • Ottawa, ON, K1A 0H3
  • Telephone: 613-957-0700 or 1-866-582-1884
  • Fax: 613-957-0862
  • Email: iaac.information.aeic@canada.ca

Date modified: