Clearwater Multi-User Access Project, Alberta
The Minister of the Environment has designated this project and the environmental assessment will continue under the former Canadian Environmental Assessment Act.
The proposed Clearwater Multi-User Access Project is a 30 km long, 40 m wide all-season access road in the Rural Municipality of Wood Buffalo, Alberta. The road will provide access from Highway 69 to an existing network of resource roads that connect to the east Athabasca Highway. The project requires bridge construction over the Clearwater River, along with 17 other crossings of various watercourses along the proposed route. The bridge over the Clearwater River will have three spans and two in-water piers. The approximate footprint of each pier is 13 m2. The piers will be constructed using work platforms on a temporary bridge.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Contacts
Prairies and Northern Regional EA ContactTransport Canada
P.O. Box 8550
3-344 Edmonton Street
Winnipeg, Manitoba R3C 0P6
Telephone: 204-983-3533
Email: pnrea-rpnee@tc.gc.ca
-
Location
- Clearwater River (Alberta)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
Terminated -
Proponent
Ledcor CMI Ltd -
Authorities
- Transport Canada
-
Assessment Type
Screening-type assessment under CEAA 1992 -
Reference Number
59994
Nearby assessments
...within 200 kilometres-
2017 NGTL System Expansion Project
Fort McMurray -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Jackpine Mine Expansion Project
Fort McKay -
Pierre River Mine Project
Fort McKay -
Chipewyan Prairie First Nation Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Frontier Oil Sands Mine Project
Fort McKay -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Bigstone Cree Nation ATCO Gas and Pipelines Ltd.: 1098480 Wabasca IR No. 166 Phase 2 Alfred Road Gas Main & Distribution System
Bigstone Cree Nation -
Patterson Lake South Mine Project
Patterson Lake -
Bigstone Cree Nation & Hamlet of Sandy Lake - ATCO Gas and Pipelines Ltd.: 1088866 - Gas Feeder and Mains at Wabasca IR No. 166
Bigstone Cree Nation -
Rook 1 Project
Patterson Lake -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
TURNOR LAKE I.R. 193B (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
TURNOR LAKE I.R. 193B (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
TURNOR LAKE I.R. 193B (Tower 3) -
ATCO Gas and Pipelines Ltd.: 1088866 Wabasca IR No. 166A Gas Distribution Extension
Bigstone Cree Nation Wabasca IR No. 166A -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
Bigstone Cree Nation Education Authority: CU254 Oksi Pasikoniwew Kakik School Secondary Access Road Project
Bigstone Cree Nation -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation High School Waterline Project
Wabasca -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK
Buffalo River Dene Nation I.R. 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Rogers Communications Inc., new radiocommunications tower (W6225) on Peerless Trout First Nation land, near Peerless Lake, AB.
W6225 - Peerless Trout First Nation Land (near Peerless Lake) -
North Corridor Expansion Project
Peerless Lake -
Rogers Communications Inc., new radiocommunications tower (W6238) on Peerless Trout First Nation land, near Trout Lake, AB.
W6238 - Peerless Trout First Nation Land (near Trout Lake)