Search Registry

Registry Search Mobile

Registry Search

Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

Skip to Filters

540 results

Project Water Supply Tunnel at Second Narrows - Metro Vancouver - Amendment

  • Location (Water Supply Tunnel at Second Narrows - Metro Vancouver - Amendment, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81198
  • Last Modified: 2020-12-03
  • Relevance: 10298.53
  • The Proposed Project Traylor Aecon GP on behalf of Metro Vancouver Regional District have proposed to carry out physical works related to the approved Project Permit No. 17-164: Water Supply Tunnel at Second Narrows – Metro Vancouver beyond the standard construction hours and they have also requested to conduct refueling and maintenance within 30 metres of a waterbody. Extended work hours request This amendment is being requested for two main reasons: Safe Haven Refrigeration ...

Project Louis Bull Tribe - 2020 Septic System Improvements

  • Location (Louis Bull Tribe, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81197
  • Last Modified: 2020-12-03
  • Relevance: 10298.26
  • The removal of old septic tanks, at about 19 properties on the Louis Bull Tribe reserve lands, to be replaced by new concrete tanks with working capacity of at least 5220 L (1150 Gal, acceptable for approximately 7 persons or 5 bedrooms). Old shoot outs to be replaced by appropriately designed (by On-Site Sewerage Professional) dispersal field. Miscellaneous piping connections as needed. Amendment: A lined septic lagoon (20mx40m) will be installed at one location (53°00'22.2"N ...

Project Port of Oshawa Salt Terminal

  • Location (Oshawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81193
  • Last Modified: 2020-12-03
  • Relevance: 10298.04
  • A project to add bulk salt storage on federal lands at the Port of Oshawa has been proposed by Cargill. The project entails operation of a terminal for salt storage and distribution and will involve the construction of an asphalt pad covering an area of approximately 250 metres by 120 metres (or 1.2 hectares). The operation would be from approximately March to December each year and the salt would arrive by laker vessels and be moved to a covered storage pile on the pad. In the winter months, ...

Project South Frontenac Township Culvert Rehabilitation, Stafford Lane

  • Location (Rideau Canal National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81196
  • Last Modified: 2020-12-03
  • Relevance: 10297.54
  • The Township of South Frontenac is proposing to rehabilitate a culvert that passes beneath Stafford Lane, adjacent to Little Cranberry Lake, which is part of the Rideau Canal waterway. Stafford Lane is the boundary of Parks Canada's jurisdiction; the south side of the culvert is PCA jurisdiction whereas the north side is not. The major components of the project involve culvert rehabilitation and installation of a new armour stone retaining wall system in order to extend its service ...

Project BHP Canada Exploration Drilling Project

  • Location (325 kilometres northeast of St. John's, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80174
  • Last Modified: 2020-12-03
  • Relevance: 10297.41
  • BHP Petroleum (New Ventures) Corporation is proposing to conduct an exploration drilling project within offshore exploration licences in the Orphan Basin, located approximately 350 kilometres northeast of St. John's, Newfoundland and Labrador in the Atlantic Ocean. As proposed, the BHP Canada Exploration Drilling Project would allow the proponent to determine the presence, nature, and quantities of the potential hydrocarbon resource in exploration licences 1157 and 1158.

Project Construction of a Royal Canadian Mounted Police Detachment in Flin Flon, Manitoba

  • Location (Flin Flon, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81167
  • Last Modified: 2020-12-03
  • Relevance: 10297.37
  • The Proposed Project The Royal Canadian Mounted Police are proposing to construct a new police detachment and associated garage in the City of Flin Flon Manitoba. Planned footprint of new detachment building is approximately 676m². Construction will occur on an existing serviced lot in the City of Flin Flon Manitoba.

Project Overhead Electrical Line Vegetation Clearing

  • Location (Kejimkujik National Park and National Historic Site, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81195
  • Last Modified: 2020-12-03
  • Relevance: 10297.34
  • Kejimkujik National Park and National Historic Site proposes to permit Nova Scotia Power and its vegetation management contractors to clear vegetation (trees and shrubs) along the existing overhead electrical line rights-of-way, spanning a distance of approximately 22 km, within the park. This work must be completed periodically to prevent vegetation from contacting the energized conductors. Vegetation contacting electrical wires is a cause of power outages, a hazard to visitors and park staff ...

Project Boat Harbour Remediation Project

  • Location (Five kilometres east of Pictou, Nova Scotia)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80164
  • Last Modified: 2020-12-03
  • Relevance: 10297.17
  • Nova Scotia Lands Inc. is proposing the remediation of Boat Harbour and nearby lands, located next to Pictou Landing First Nation and five kilometres east of Pictou, Nova Scotia. In 1967, the provincial government constructed the Boat Harbour Effluent Treatment Facility to treat effluent from industrial sources and in the process, reconstructed a natural tidal estuary into a closed effluent stabilization basin. The Government of Nova Scotia closed the facility in January 2020 and as ...

Project Paving upgrade - Stanhope Border Crossing

  • Location (Stanhope, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81194
  • Last Modified: 2020-12-03
  • Relevance: 10297.15
  • The CBSA plans to rehabilitate access roads to the border crossing and dismantle a former 2000 sq m parking lot. The work will include the removal of concrete slabs under the existing pavement, reconstruction of the foundation of the roadway, and paving asphalt. The old parking lot will be stripped and restored to its natural state by adding vegetation. 

Project Grassy Mountain Coal Project

  • Location (Southwest Alberta, approximately 7 kilometres north of Blairmore, Alberta)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 80101
  • Last Modified: 2020-12-02
  • Relevance: 10294.08
  • Benga Mining Limited, a wholly owned subsidiary of Riversdale Resources Limited, is proposing to construct and operate an open-pit metallurgical coal mine near the Crowsnest Pass, approximately seven kilometres north of the community of Blairmore, in southwest Alberta. As proposed, the production capacity of the project would be a maximum of 4.5 million tonnes of processed coal per year, over a mine-life of about 25 years.

Project Former Landfill Site Remediation. Federal Contaminated Sites Inventory (FCSI) #07930006

  • Location (3 Wing Canadian Forces Base Bagotville, situated in the district of La Baie, in the city of Saguenay, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81192
  • Last Modified: 2020-12-02
  • Relevance: 10294
  • This project consists of work execution, labor, materials/supplies and tools needed for the remediation of the former landfill site and ground water monitoring wells installation. Containment with a geomembrane and backfill will prevent contact with ecological receptors and water infiltration. Work includes but is not limited to; topsoil removal, backfill and levelling of the area, geomembrane installation, site remediation with contaminant free topsoil and hydroseeding. Drilling for the ...

Project Little Red River Cree Nation John D'or Prairie Gravel Pit Expansion

  • Location (Little Red River Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81189
  • Last Modified: 2020-12-01
  • Relevance: 10290.06
  • This planned pit is north of an existing pit that was mined historically to support Little Red River Cree Nation, and will be 85.6 ac or 34.64 ha with a phased, four cell development sequence to minimize site disturbance and allow for progressive reclamation. Little Red River Nation conducted test hole exploration of the area including 28 test to quantity the resource extent and delineate pit boundary. Development is planned by Caribou Mountain Construction to expand in the ...

Project Small-scale habitat enhancement for bears near Lake Louise, Alberta

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81191
  • Last Modified: 2020-12-01
  • Relevance: 10289.81
  • The purpose of this project is to test the effectiveness of small-scale forest thinning to create alternate foraging patches for bears at locations that are away from roads and other human infrastructure. Exclusion fencing may be concurrently used to promote the use of newly created alternate foraging patches. This project will be assessed with a basic impact assessment.

Project CBC / Radio-Canada Warehouse Expansion at 2415 Richardson Side Road

  • Location (2415 Richardson Side Road, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81188
  • Last Modified: 2020-12-01
  • Relevance: 10289.31
  • CBC / Radio-Canada has decided to consolidate its entire collection of film reels in one location.  In addition to the film reals there are a small number of related files and drawings as well as 500 square feet of storage for artwork storage.  To achieve this, it needs to build an addition on an existing warehouse at 2415 Richardson Side Road in Ottawa, Ontario. The addition is comprised of a one storey warehouse space with a "cooled" room inside to store the film at the ...

Project Montana First Nation Emergency Road Repairs

  • Location (Montana First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81105
  • Last Modified: 2020-12-01
  • Relevance: 10289.05
  • Complete repairs to flood damaged roads and ditches at select locations and make improvements to help prevent additional flood damage at those locations. Work includes clearing/grubbing and reshaping existing ditches, installation of culverts and graveling existing roadways to raise road elevation and create road crown for drainage. A total of 16 locations have been identified for repairs within the road right of way.  The total approximate length of road improvements is 2.8 km. ...

Project Heart Lake BF 80752 Bridge Replacement

  • Location (Heart Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80936
  • Last Modified: 2020-12-01
  • Relevance: 10289.04
  • Heart Lake First Nation is proposing to replace a bridge over the Piche River on the Heart Lake First Nations Reserve No. 167. The Project is located within SW 01-070-11 W4M (approximately 15 km east of Highway 881 and 70 km northeast of Lac La Biche) and consists of Bridge File (BF) 80752 crossing the Piche River along an unnamed local road. An assessment of BF 80752 indicated that the bridge is in poor condition and near the end of its useful life, and requires either rehabilitation ...

Project Storage Tank Installation, Garrison Petawawa

  • Location (POL Waste Storage Facility 184 Pashmul Road Unit D-106, Garrison Petawawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81187
  • Last Modified: 2020-12-01
  • Relevance: 10288.72
  • Real Properties Operations Detachment Petawawa at Garrison Petawawa is proposing the replacement of two Storage Tanks that are greater than 5,000 litres at the POL Waste Storage Facility at Garrison Petawawa. This facility is required for the proper collection and storage of hazardous waste fuels prior to removal from the Garrison.

Project Muskowekwan Solid Waste Transfer Station

  • Location (Muskowekwan IR 85, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81186
  • Last Modified: 2020-12-01
  • Relevance: 10288.42
  • The scope of the work for the Muskowekwan Solid Waste Transfer Station Project includes the pre-design, design, construction, and operation of a solid waste transfer station on NE 12-27-15 W2M located on Muskowekwan IR 85.  The project consists of the construction of a solid waste transfer structure.  Permanent works include build up earthen ramp to support placement of refuse in containers.  Once full the containers are transported to a regional landfill.  Other ...

Project Shoreline Protection at 177 Duncan Street in New Westminster

  • Location (Shoreline Protection at 177 Duncan Street in New Westminster, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81111
  • Last Modified: 2020-12-01
  • Relevance: 10286.69
  • The proposed project  The Vancouver Fraser Port Authority's engineering and maintenance department proposes to install shoreline protection at a section of shoreline located on the south bank of the North Arm of the Fraser River, fronting 177 Duncan Street in New Westminster, BC. The shoreline protection is required to replace the existing temporary measures put in place in November 2019. The shoreline protection is intended to protect and ...

Project Stormwater outfall and dike upgrades

  • Location (Stormwater outfall and dike upgrades, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81112
  • Last Modified: 2020-12-01
  • Relevance: 10286.69
  • The proposed project       The City of Maple Ridge (the City) is proposing to upgrade the stormwater infrastructure around Princess Street. As part of these upgrades, the City will upgrade the Princess Street Pump Station and the associated discharge infrastructure. The Proponent is proposing to clear approximately 150 square meters of riparian habitat using an excavator. A sheet-pile coffer dam will be installed ...

Project Standing Buffalo Dakota Nation - Solid Waste Transfer Station

  • Location (Standing Buffalo IR 78, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81185
  • Last Modified: 2020-11-30
  • Relevance: 10285.35
  • Standing Buffalo Dakota Nation - Solid Waste Transfer Station The scope of the work for the Standing Buffalo Dakota Nation Solid Waste Transfer Station Project includes the pre-design, design, and construction of a solid waste transfer station on NW-03-22-14-W2 located on Standing Buffalo IR 78.  The Project will also include the purchase of a compactor collection truck, household waste bins, and recycling bins for community users. New infrastructure will include:  - New ...

Project Contrecoeur Port Terminal Expansion Project

  • Location (Contrecoeur, 40 kilometres north-east of Montreal, Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80116
  • Last Modified: 2020-11-30
  • Relevance: 10285.08
  • The Montreal Port Authority proposes the construction of a container port terminal with a maximum annual capacity of 1.15 million containers on its property located in Contrecoeur, approximately 40 kilometres downstream from Montreal. The project would include the construction of a 675-metre dock for two berths to accommodate vessels between 39,000 and 75,400 deadweight tonnage (DWT). The project would also include a seven track classification yard, a container storage and ...

Project Keswick Post Office Site Remediation

  • Location (Keswick, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80959
  • Last Modified: 2020-11-30
  • Relevance: 10284.87
  • This project involves remediation of contaminated soil and groundwater under the paved area of the property, which has been historically impacted by petroleum hydrocarbons from a former underground storage tank (previously removed). An environmental consultant will be on-site during the remediation and will oversee the contractors and conduct sampling activities. Impacted soil and liquid material (as necessary) will be excavated, trucked and disposed of at approved disposal facilities in ...

Project Port Weller Water Level Gauge Station Shoreline Reinforcement Project

  • Location (St. Catharines, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81165
  • Last Modified: 2020-11-30
  • Relevance: 10284.81
  • Fisheries and Oceans Canada owns a water level gauging station in Port Weller, Ontario that is used for measuring water levels in Lake Ontario for use in navigation safety, cargo loading and unloading, monitoring, forecasting, and regulation. Operated  by Canadian Hydrographic Services, the Port Weller Gauge Station is located immediately west of the Canadian Coast Guard's Port Weller Search and Rescue Station on the west side of the west breakwater at the northern terminus of the ...

Project Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade

  • Location (Standing Buffalo IR 78, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81184
  • Last Modified: 2020-11-30
  • Relevance: 10284.63
  •   Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade - Public Comments Invited November 30, 2020 - Indigenous Services Canada must determine whether the proposed Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade, located on Standing Buffalo IR 78 is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination. Written comments must ...

Project Beach Revitalization and New Boardwalk Trail

  • Location (Detailed Impact Assessment, Rouge National Urban Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81149
  • Last Modified: 2020-11-30
  • Relevance: 10284.47
  • The Rouge Beach Improvements project features a revitalization of the Beach Day Use Area within Rouge National Urban Park; a new signature trail that will provide an in-park connection from Rouge Beach to the existing Mast trail; improvements to the existing Mast Trail trailhead, as well as emergency work on the lower beach area to combat climate change, flooding, and erosion. The primary goals of the project are community improvements to the beach area, climate change adaptation and community ...

Project Indoor Riding Arena

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81107
  • Last Modified: 2020-11-29
  • Relevance: 10278.21
  • Project summary: Build an indoor riding arena to allow for year-round horse riding. How is NCC or NCC land involved:  NCC tenant to build and pay for the building. NCC's role: Arena to be constructed on NCC land by a tenant. Impacts to land or neighbours: The proposed project will not significantly change the appearance of the surrounding area, as the site is shielded by trees and cannot be seen clearly from the road. The design of the arena is consistent with the look and ...

Project Piapot Lagoon, Forcemain and Sewage Pumping Station

  • Location (Piapot IR 75, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81108
  • Last Modified: 2020-11-28
  • Relevance: 10274.03
  • The current lagoon at Piapot First Nation has come to the end of its life span. The proposed project is for the: construction of a two celled HDPE lined facultative lagoon (primary cell 2.2ha, Storage: 91,000 Cu.m), construction of a new sewage pumping station (70Sq.M with a storage capacity of 50,000L), upgrades to the mechanical and electrical of an existing lift station. Installation of a new HDPE sewage force main to the new lagoon location. infrastructure life span anticipated for 30+ ...

Project Port Hardy CCG SAR - Float Replacement Project

  • Location (Port Hardy, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81173
  • Last Modified: 2020-11-27
  • Relevance: 10272.91
  • The construction and installation of a new 4.3 m x 31.6 m concrete float in the Port Hardy Harbour.  The work will include: the removal of existing timber pilings and mooring float; modify and relocate the existing timber float and community timber float, including the installation of new steel piles; the relocation of existing gangway, and installation of new concrete float (which will be constructed off-site).

Project Theresa Point First Nation road re-construction

  • Location (St Theresa Pt First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81183
  • Last Modified: 2020-11-27
  • Relevance: 10272.56
  • Multi-phase project to re-construct 40 kms of community roads.  First Phase is to reconstruct 10 km of main (primary) road from north cemetery to the landfill site south.  The construction will involve re-grading the road resurface the side ditch walls repair drainages.  Then apply a road stabilization solution to the entire road, a new layer of traffic gravel will be top-off, stabilization will include a long-term solution to our dust issues by applying an environmentally ...

Project Rocky Point Park Boat Ramp Repair in Port Moody

  • Location (Rocky Point Boat Ramp Repair in Port Moody, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81182
  • Last Modified: 2020-11-27
  • Relevance: 10272.49
  • The Proposed Project  The City of Port Moody proposes to install new scour protection and repair the concrete boat launch ramp located at Rocky Point Park in Port Moody. The proposed scour protection includes the installation of custom gabion structures at the toe of the ramp. Gabions are proposed to be installed by excavator and extend two meters beyond the edge of the existing ramp. The concrete ramp repairs include pressure washing and concrete repair. The works are proposed to take ...

Project South Shore Corridor Project - Extended Work Hours Request

  • Location (South Shore Corridor Project - Extension to Expiry Date, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80856
  • Last Modified: 2020-11-27
  • Relevance: 10272.47
  • The Proposed Project Vancouver Fraser Port Authority Infrastructure Delivery is proposing to carry out physical activities related to the approved Project Permit No. 2011-125-5: South Shore Corridor Project 24 hours a day, 7 days a week from January 4 and to July 4, 2021.   This amendment is being requested to enable construction during low traffic volumes to minimize traffic disruptions on Commissioner Street. The project components ...

Project Value Chain Solutions - Heartland Complex Expansion Project

  • Location (18 kilometres north east of Fort Saskatchewan, Alberta)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 81148
  • Last Modified: 2020-11-27
  • Relevance: 10272.31
  • Value Chain Solutions Inc. is proposing to expand its approved Heartland Project, a bitumen upgrader and refinery, located in Alberta's Industrial Heartland, about 18 kilometres northeast of Fort Saskatchewan. As proposed, the Value Chain Solutions – Heartland Complex Expansion Project would increase the facility's input capacity by three hundred percent, bringing its total capacity to 119,240 m3/day or 750,000 barrels/day. The project would include activities such as the ...

Project Expansion of the Lumber Transload Facility of Goodrich Terminal2012 Ltd. at the Port of Vancouver

  • Location (Port of Vancoouver, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81179
  • Last Modified: 2020-11-27
  • Relevance: 10272.22
  • Goodrich Terminal2012 Ltd. is requesting financing from the Business Development Bank of Canada (BDC) for leasehold improvements to expand their transload facility. The funds will be used to lay a rail spur and make the necessary site improvements (fencing, paving, security) to allow Goodrich Terminal2012 Ltd. to integrate rail transportation into its operations.   The site is leased from the Vancouver Fraser Port Authority and is approximately 50,000 m2 (540,000 ft2) in size. ...

Project Pacific Terminals Emergency Vehicle Road Access

  • Location (Pacific Terminals Emergency Vehicle Road Access, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81181
  • Last Modified: 2020-11-27
  • Relevance: 10271.81
  • The Proposed Project Viterra Pacific Elevators Limited are proposing to construct a new access road for the use of emergency and maintenance vehicles, located at 1803 Stewart Street, Vancouver, BC. The works include demolition of approximately 82 square metres of existing buildings, demolition of two existing retaining walls and grading and paving of the new access road footprint which will be approximately 144 square metres. The existing chain linked fence will be modified and the entrance ...

Project Sandy Bay First Nation New Water Treatment Plant

  • Location (Sandy Bay First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81180
  • Last Modified: 2020-11-27
  • Relevance: 10271.79
  • Sandy Bay First Nation New Water Treatment Plant Project Summary: Sandy Bay Ojibway First Nation (SBOFN) Reserve No. 283 is located on the south basin of Lake Manitoba in the Westlake Region of Manitoba, 120 km northwest of Winnipeg and 60 km northwest of Portage la Prairie. The reserve is accessed by an all-weather provincial road grid system via PTH 50. SBOFN has a total registered population of 6,781 people. The estimated on reserve population including both registered and ...

Project Canadian Nuclear Laboratories Bulk Storage Laydown Area

  • Location (Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81178
  • Last Modified: 2020-11-27
  • Relevance: 10271.39
  • In support of ongoing operations at Canadian Nuclear Laboratories (CNL), the construction of a laydown area is proposed at the Atomic Energy of Canada (AECL), Chalk River Laboratories (CRL) site.  The new laydown area will provide a centralized location to store supplies that support waste management operations at the CRL site.   The proposed site for the facility is located on approximately 1,200 m2 of previously disturbed land.  The physical activities associated with this ...

Project Parks Canada HWY 93S Boom Creek Culvert Replacement

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80845
  • Last Modified: 2020-11-27
  • Relevance: 10271.34
  • Replace existing corrugated steel plate arch culvert at Boom Creek on Hwy 93S with a new concrete box culvert. Existing culvert will be decommissioned and abandoned in place. New culvert to be installed beside old and stream realigned to match new culvert entrance. Fish connectivity to be improved using baffles, a j-hook at entrance, and outfall pool. Temporary bypass lanes required. Paving, rip rap, and stream bank restoration included.

Project Canadian Nuclear Laboratories Intermediate Level Waste Storage Area

  • Location (Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81177
  • Last Modified: 2020-11-27
  • Relevance: 10271.3
  • In support of ongoing operations at the Canadian Nuclear Laboratories (CNL), the construction of an Intermediate Level Waste (ILW) Storage Facility is proposed at the Atomic Energy of Canada (AECL), Chalk River Laboratories (CRL) site.  The new facility will create a centralized storage location for CNL's ILW until a final solution is developed.  The proposed site for the facility is located on approximately 2,100 m2 of previously disturbed land.  The physical activities ...

Project Sucker Creek Housing Project 2020 (4 Units)

  • Location (Sucker Creek First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81100
  • Last Modified: 2020-11-26
  • Relevance: 10268.3
  • Rural residential Housing. Supply and install 1400 sq ft prefabricated modular home with Poured concrete foundation piling system. Site servicing comprised of 1500 gal precast concrete water cistern, 2000 gal precast concrete sewage holding tank, 3 phase power, natural gas and driveway. Rubber tired backhoe, Skidsteer, John Deere 200 Trackhoe, and D5 Cat Crawler Tractor to be used for excavation, driveway construction, backfill and landscaping. Rural residential Housing. Supply and install ...

Project Red Sucker Lake First Nation New Landfill

  • Location (Red Sucker Lake, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81176
  • Last Modified: 2020-11-26
  • Relevance: 10268.2
  •   Red Sucker Lake First Nation (RSLFN) is located approximately 710 km northeast of Winnipeg, Manitoba. The community is accessible all year round by air travel and by winter road during the winter months. The total registered population of RSLFN is approximately 1,128 members, based on the regional population statistics (January 2020).   The proposed Waste Management Facility (WMF) is located north of RSLFN on reserve Land, approximately 500 m north of the ...

Project Wasamac Gold Mine Project

  • Location (Wasamac, Quebec)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80879
  • Last Modified: 2020-11-26
  • Relevance: 10267.69
  • Monarch Gold Corporation is proposing the construction, operation, decommissioning and abandonment of an underground gold mine located in the Abitibi-Témiscamingue region, approximately 15 kilometres from downtown Rouyn-Noranda, Quebec. As proposed, the Wasamac Gold Mine Project would have a mine life of 11 years and an ore production capacity of 6053 tonnes per day. The project would include the operation of an underground mine, the construction of an ore processing plant ...

Project Nappan Island Bridge Replacement, Municipality of Trent Hills

  • Location (Municipality of Trent Hills, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81175
  • Last Modified: 2020-11-25
  • Relevance: 10264.52
  • The Municipality of Trent Hills proposes to replace the Nappan Island Bridge located on Nappan Island Road, approximately 4.6km East of Highway 30. The structure spans the narrows between Burnt Point Bay and Lake Seymour. A new bridge will be built approximately 2m west of the existing bridge.  The new bridge will be a single lane steel Bailey bridge measuring approximately 60 m long and 6.55 m wide with a 1.67 m wide pedestrian lane on the east side of the bridge. As the new bridge ...

Project Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design

  • Location (1 kilometre east of Unity, Saskatchewan, Saskatchewan)
  • Assessment Type: Request for designation
  • Status: In progress
  • Reference Number: 81166
  • Last Modified: 2020-11-25
  • Relevance: 10264.16
  • Great Sandhills Railway Ltd. is proposing to expand the existing North West Terminal, a grain handling facility located one kilometre east of Unity, Saskatchewan and serviced by the Canadian National Railway (CN) and the Canadian Pacific Railway (CP). As proposed, the Great Sandhills Railway Switching Operation at North West Terminal Project – Revised Design would include 8.9 hectares of new tracks, including two shop tracks and a repair shop. The new tracks would reduce ...

Project Okanese Cree Nation - Water Treatment Plant Upgrade

  • Location (Okanese IR 82, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81174
  • Last Modified: 2020-11-25
  • Relevance: 10263.93
  • The existing water treatment plant for Okanese Cree Nation has reached the end of it's life span as it is not able to meet demand of the community, therefore a new water treatment plant is proposed to be constructed in NE 32-22-10 W2M. The water treatment plant upgrades to include a new water treatment plan, including room for expansion to meet the future goals of the community. The upgrade will also include new treatment and pumping equipment, dry pit access, backup power, control ...

Project Building Demolitions and Associated Soil Remediation at Stony Point (former Camp Ipperwash), Ontario

  • Location (Stony Point is located at 9356 Army Camp Road within the municipality of Lambton Shores, in southwestern Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81172
  • Last Modified: 2020-11-24
  • Relevance: 10260.4
  • Canada is committed to the timely and successful clearance and remediation of the Stony Point land in accordance with the Ipperwash Final Settlement Agreement between the Kettle and Stony Point First Nation and Her Majesty the Queen in Right of Canada. As per the Final Settlement Agreement, the Department of National Defence (DND) will conduct clearance and remediation activities to prevent, minimize and mitigate risks to human health, safety and the environment for the express purpose of ...

Project French River Boathouse, Wharf, and Workshop

  • Location (French River Dam Office, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81171
  • Last Modified: 2020-11-24
  • Relevance: 10260.36
  • This project will involve work at three structures at the French River Dam office site in Dokis, Ontario: the boathouse, wharf, and workshop. The boathouse will be replaced with a new light wood framed boathouse. This will include a new watercraft lifting system, concrete pier off-shore foundations and on-shore foundations. The wharf will be replaced with a new cast-in-place concrete earth retaining structure. The foundation of the workshop will be replaced with cast-in-place concrete piers.

Project Winter Cove Boat Ramp Repair, Saturna Island

  • Location (Gulf Islands National Park Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81170
  • Last Modified: 2020-11-24
  • Relevance: 10259.8
  • This project will repair a hazardous void in the intertidal portion of the boat ramp at Winter Cove on Saturna Island. The plan is to fill the void with approximately 3 cubic meters of washed clear crush aggregate, compacting the material so as to produce a durable surface. The choice to use washed clear crush aggregate rather than the typical road base gravel is intended to minimize the likelihood of siltation, increased turbidity, and associated negative impacts to the marine environment. All ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Assessment Status Display Filters

Date modified: