575 results

Project Waterloo Airport Runway Project

  • Location (Region of Waterloo International Airport, Runway 14-32, Ontario)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 81452
  • Last Modified: 2021-04-18
  • Relevance: 796.93
  • The Region of Waterloo International Airport is proposing to extend runway 14-32 from the current length of 1250 metres to a final length of 2134 metres, construct new access roads and a parallel taxiway, modify the runway approach lighting, and expand or relocate the terminal building. This work would improve the overall use of the airport, located in Breslau, Ontario, by upgrading the runway, which is currently capable of serving aircraft of Aircraft Group Number IIIA, so that it would become ...

Project Correct Fuel Tank Deficiencies

  • Location (350 King Edward, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81455
  • Last Modified: 2021-04-17
  • Relevance: 792.54
  • The existing fuel oil system serving 350 King Edward Avenue's life safety emergency genset and two (2) client gensets have been identified during their annual inspections that they are not in conformance with the current fuel oil code for fuel oil burning equipment CAN/CSA B139-15 - Installation code for oil-burning equipment. The fuel system is identified and registered under ECCC# 00003613. The objective of this project is to correct deficiencies within the fuel-oil system to satisfy ...

Project Value Chain Solutions - Heartland Complex Expansion Project

  • Location (18 kilometres north east of Fort Saskatchewan, Alberta)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 81148
  • Last Modified: 2021-04-16
  • Relevance: 790.99
  • Value Chain Solutions Inc. is proposing to expand its approved Heartland Project, a bitumen upgrader and refinery, located in Alberta's Industrial Heartland, about 18 kilometres northeast of Fort Saskatchewan. As proposed, the Value Chain Solutions – Heartland Complex Expansion Project would increase the facility's input capacity by three hundred percent, bringing its total capacity to 119,240 m3/day or 750,000 barrels/day. The project would include activities such as the ...

Project Cascade Pit Gravel Crushing

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81542
  • Last Modified: 2021-04-16
  • Relevance: 790.95
  • Parks Canada Highway Operations Unit is proposing to crush 11,033m3 of existing gravel debris that is currently stored as Cascade Pit in Banff National Park for use in winter road abrasive. Once crushed, 5000m3 of the material will be moved immediately from the pit to the Banff Operations Compound, and pickled for use as winter abrasive. The remaining 6033m3 will remain at Cascade Pit until 2022, when it will be transported for storage at the Operations Compound, where it will be pickled for ...

Project Alderville First Nation - Communal and POE Water Treatment Systems

  • Location (Alderville First Nation Reserve, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81541
  • Last Modified: 2021-04-16
  • Relevance: 790.86
  • The Alderville First Nation (the Proponent) is proposing to decommission, construct and upgrade water-related infrastructure, entirely within the Alderville First Nation. New construction includes: A production well; A high capacity water treatment plant; ~750 metres of conveyance piping; 18 service connections to public buildings; 10 point-of-entry systems; An underground reservoir for water storage; and A high lift pumping station. Upgrades include: Works on ...

Project Hydrometric Station Decommissioning - Fisher River, Manitoba

  • Location (Fisher River, Manitoba, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81507
  • Last Modified: 2021-04-16
  • Relevance: 790.14
  • Environment and Climate Change Canada proposes to decommission a non-operational hydrometric station at Fisher River, Manitoba. This includes removing a metal walk-in shelter and a cableway. The cableway consists of a 55 m steel cable across the river, 2 towers (10 m from the river), and concrete anchors for the towers (7 m from the river). The steel cable will be cut and immediately winched to a drum. The towers and anchors will then be removed. The work will be completed within 1-3 days.

Project Rose Lithium-Tantalum Mining Project

  • Location (Municipality of Baie-James, Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80005
  • Last Modified: 2021-04-16
  • Relevance: 788.21
  • Critical Elements Corporation is proposing the construction, operation and decommissioning of an open pit lithium and tantalum mine located approximately 38 kilometres north of Nemaska, in Quebec. As proposed, the project includes the operation of an open pit, waste and tailings impoundment area, an industrial ore processing facility and the option of transforming concentrate off-site. The mine would produce about 4,500 tonnes of ore per day over a 17-year life span. The project would last 26 ...

Project Ocean Man Indian Reserve 69E Pipeline4

  • Location (Ocean Man Indian Reserve 69E, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81537
  • Last Modified: 2021-04-15
  • Relevance: 787.43
  • A 15 m wide, 390 m long right of way easement will provide for the construction and operation of a  pipeline that will transport oil and produced water.  Construction of the pipeline and reclamation of the right of way will be completed within the first year of the project.  Following decommissioning of the pipeline, the right of way will be surrendered.

Project O'Chiese Culvert 2 Replacement Project

  • Location (O'Chiese First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81535
  • Last Modified: 2021-04-15
  • Relevance: 787.03
  • O'Chiese First Nation plans to replace and repair culvert and road assets damaged by the 2020 spring flooding. The proposed project will replace a damaged culvert, located at 8-2-45-11-W5M, with a new culvert of appropriate size for the drainage area. The project will also repair the road crossing the culvert to pre-flood condition and add erosion control.

Project O'Chiese Culvert 3 Replacement Project

  • Location (O'Chiese First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81536
  • Last Modified: 2021-04-15
  • Relevance: 787.02
  • O'Chiese First Nation plans to replace and repair culvert and road assets damaged by the 2020 spring flooding. The proposed project will replace a damaged culvert, located at 8-27-44-10-W5M, with a new culvert of appropriate size for the drainage area. The project will also repair the road crossing the culvert to pre-flood condition and add erosion control.

Project O'Chiese Culvert 1 Replacement Project

  • Location (O'Chiese First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81534
  • Last Modified: 2021-04-15
  • Relevance: 786.96
  • O'Chiese First Nation plans to replace and repair culvert and road assets damaged by the 2020 spring flooding. The proposed project will replace a damaged culvert, located at 11-27-44-10-W5M, with a new culvert of appropriate size for the drainage area. The project will also repair the road crossing the culvert to pre-flood condition and add erosion control.

Project Department of National Defence Building Construction and Recapitalization, Canadian Forces Base 14 Wing Greenwood, Greenwood, Nova Scotia

  • Location (Canadian Forces Base (CFB) 14 Wing Greenwood, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81533
  • Last Modified: 2021-04-15
  • Relevance: 786.61
  • The Department of National Defence proposes to construct two new cadet buildings (a Cadet Training Building and a Cadet Accommodations Building) and recapitalize three existing cadet trailers (B229, B233, and B239) located at Cadet Compound, Ad Astra Way, 14 Wing Greenwood, Greenwood, Nova Scotia (44°58'42.60"N, 64°55'6.60"W). The new cadet buildings will consist of one-level structures with a slab-on-grade construction. The new Cadet Training Building (approximately ...

Project Banff Air Strip Structure Removal

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81532
  • Last Modified: 2021-04-15
  • Relevance: 786.51
  • Parks Canada is proposing to remove all non-emergency assets/structures at the Banff Airstrip, including two aircraft hangers and two aboveground storage tanks. This work will improve the safety for people and wildlife alike by reducing the current environmental footprint while removing hazards from abandoned structures. The airstrip itself will remain in place as an emergency landing site.

Project Stanley Park Water Supply Tunnel - Chilco Shaft

  • Location (Stanley Park Water Supply Tunnel - Chilco Shaft, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81531
  • Last Modified: 2021-04-15
  • Relevance: 786.35
  • The Greater Vancouver Water District   is planning to construct a major water infrastructure project, referred to as the Stanley Park Water Supply Tunnel, to replace a section of existing water supply infrastructure. When complete, the new tunnel will meet current seismic standards, help ensure the continued reliable delivery of clean, safe drinking water to the region, and increase the capacity of the existing system to support the region's growing population. The Project ...

Project Bayfield Annual Dredge Project

  • Location (Bayfield, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81530
  • Last Modified: 2021-04-15
  • Relevance: 786
  • The Municipality of Bluewater, with support from Fisheries and Oceans Canada's Small Craft Harbours branch, is planning to perform an annual dredge of their harbour located on the shores of Lake Huron at the mouth of the Bayfield River in the village of Bayfield. Approximately 2900 cubic metres will be dredged using a barge excavator and trucks to haul the dredge out of river. The dredge will occur towards the end of May.

Project Cavendish Campground New Loop Construction

  • Location (Prince Edward Island National Park, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81529
  • Last Modified: 2021-04-15
  • Relevance: 785.69
  • Climate change and its impacts on coastal shorelines (accelerated erosion, damaging wind events) have encouraged park managers to plan for coastal retreat for visitor offers such as camping. As such, this proposed project will relocate a new campground loop for Cavendish Campground inland to be more protected from climate change impacts. It was also chosen due to its room for expansion in future years as erosion continues to erode the shoreline away at Cavendish Campground. The new loop will ...

Project Canadian Nuclear Laboratories Multi-Purpose Waste Handling Facility

  • Location (Chalk River Laboratories, Chalk River On, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81443
  • Last Modified: 2021-04-15
  • Relevance: 783.92
  • In support of ongoing operations at Canadian Nuclear Laboratories (CNL), the construction of two new multi-purpose waste handling facilities are proposed at Atomic Energy of Canada Limited's Chalk River Laboratories site to process and store Low Level Waste (LLW) and Intermediate Level Waste (ILW).  The physical activities associated with the construction of these facilities will include improving local drainage and tie-in of existing utilities.  The proposed site for the ...

Project Cap-aux-Meules - Consolidation and extension of the wharf

  • Location (Cap-aux-Meules, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81526
  • Last Modified: 2021-04-14
  • Relevance: 783.08
  • Transport Canada is proposing a project to extend and consolidate the wharf at Cap-aux-Meules. The work includes, among others, the installation of new piles, increasing the capacity of mooring bollards, installing a new defense system and installing a steel ramp for pedestrian access. The works are scheduled for September 2021 to March 2022.

Project Ocean Man Indian Reserve 69E Pipeline3

  • Location (Ocean Man Indian Reserve 69E, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81527
  • Last Modified: 2021-04-14
  • Relevance: 782.9
  • A 15 m wide, 221 m long right of way easement will provide for the construction and operation of a  pipeline that will transport oil and produced water.  Construction of the pipeline and reclamation of the right of way will be completed within the first year of the project.  Following decommissioning of the pipeline, the right of way will be surrendered.

Project Ocean Man Indian Reserve 69E Pipeline2

  • Location (Ocean Man Indian Reserve 69E, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81525
  • Last Modified: 2021-04-14
  • Relevance: 782.87
  • A 15 m wide, 151 m long right of way easement will provide for the construction and operation of a  pipeline that will transport oil.  Construction of the pipeline and reclamation of the right of way will be completed within the first year of the project.  Following decommissioning of the pipeline, the right of way will be surrendered.

Project Ocean Man Indian Reserve 69E Pipeline

  • Location (Ocean Man Indian Reserve 69E, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81524
  • Last Modified: 2021-04-14
  • Relevance: 782.82
  • A 15 m wide, 323 m long right of way easement will provide for the construction and operation of a  pipeline that will transport oil.  Construction of the pipeline and reclamation of the right of way will be completed within the first year of the project.  Following decommissioning of the pipeline, the right of way will be surrendered.

Project Potential Regional Assessment of a Western Energy Corridor

  • Location (near Churchill, Alberta) (near Prince Albert, Manitoba) (near Vermilion, Saskatchewan)
  • Assessment Type: Request for regional assessment
  • Status: In progress
  • Reference Number: 81514
  • Last Modified: 2021-04-14
  • Relevance: 781.97
  • The Impact Assessment Agency of Canada is reviewing a request to conduct a regional assessment of an interprovincial energy corridor, extending from east-central Alberta to northern Manitoba with associated marine shipping.

Project Wasamac Gold Mine Project

  • Location (Wasamac, Quebec)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80879
  • Last Modified: 2021-04-14
  • Relevance: 781.7
  • Yamana Gold is proposing the construction, operation, decommissioning and abandonment of an underground gold mine located in the Abitibi-Témiscamingue region, approximately 15 kilometres from downtown Rouyn-Noranda, Quebec. As proposed, the Wasamac Gold Mine Project would have a mine life of 11 years and an ore production capacity of 6053 tonnes per day. The project would include the operation of an underground mine, the construction of an ore processing plant and related ...

Project YMX International Aerocity of Mirabel - Construction of an industrial rental building on Henri-Fabre Blvd.

  • Location (YMX International Aerocity of Mirabel, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81522
  • Last Modified: 2021-04-14
  • Relevance: 781.48
  • Syscomax is proposing to build a new industrial building located on lot 4 618 690 of the Québec cadastre, on Henri-Fabre Boulevard at YMX International Aerocity of Mirabel. The floor area of the future building, which will have one floor with the possibility of mezzanine offices and will not have a basement level, will be approximately 12,450 m2. There will also be new paved areas. Trees will be planted and a white roof will cover the building to reduce heat islands.  The ...

Project Vegetation Maintenance at Point Pelee National Park

  • Location (Point Pelee National Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81447
  • Last Modified: 2021-04-14
  • Relevance: 779.68
  • This impact assessment will address the standard vegetation maintenance activities at Point Pelee National Park. The vegetation maintenance activities are required to: ensure the safety for those sharing the park's roads, trails, and other areas; uphold the park's quality visitor experience spaces; and present and protect Point Pelee's valuable assets and resources. The habitats adjacent to these areas have conditions suitable for species at risk, migratory breeding birds, and ...

Project Permanent Relocation of Barge Maintenance Terminal

  • Location (Permanent Relocation of Barge Maintenance Terminal, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81444
  • Last Modified: 2021-04-14
  • Relevance: 779.68
  • Seaspan ULC proposes to permanently relocate their Barge Maintenance Terminal adjacent to their facility at 10 Pemberton Avenue in North Vancouver. The scope of work involves the installation of three new 1220 millimetre diameter steel piles, one new 914 millimetre diameter steel pile, and relocation of three existing 914 millimetre diameter steel piles to facilitate repositioning two existing barges (SS Yarder and SS 210) approximately 115 metres south of their current location. The ...

Project Pic River Roads Rehabilitation

  • Location (Pic River Roads Rehabilitation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80750
  • Last Modified: 2021-04-14
  • Relevance: 779.68
  • This project will rehabilitate and widen approximately 4 km of Access Road and 1.7 km of Pic River Road including repavement, drainage and culvert replacement, traffic calming devices, improved sidewalks/walking trails along the road and a bus pull-over. Project update - March 14, 2021:  Road rehabilitation and widening along Access Road (850m) and Pic River Road (1.9km). Pulverize existing asphalt, repair and improve base as required, widen to 6.5m and resurface with hot mix ...

Project Maintenance Dredging at FRPD Waterlot - Amendment PER No. 20-047-01 - Extension to the Expiry Date

  • Location (Maintenance Dredging at FRPD Waterlot, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80601
  • Last Modified: 2021-04-13
  • Relevance: 778.77
  • Fraser River Pile & Dredge (GP) Inc. (FRPD) proposes to conduct multi-year and periodic maintenance dredging within the waterlot fronting the New Westminster works yard, generally located at 447 Twentieth Street, New Westminster, British Columbia up until November 26, 2025. This would require an extension to the approved project permit (PER No. 20-047), which has an expiry date of May 31, 2021. The extension is to reflect the validity of substrate samples taken at this dredging site for ...

Project Schnitzer Fire Suppression Project - Design Amendment

  • Location (Schnitzer Fire Suppression Project - Design Amendment, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80603
  • Last Modified: 2021-04-13
  • Relevance: 778.51
  • Schnitzer Steel Canada Ltd., proposes to carry out physical activities related to the instalment of a fire suppression system, including four piers for the foundation of two fire monitor towers, until December 31, 2021. This would require an extension to the approved project permit (PER 18-196-01), which has an expiry date of April 30, 2021. Due to materials shipment delays, the project would not be completed prior to April 30, 2021. There are no changes to construction activity or the ...

Project Installation of Eight Steel Pipe Piles - Project Permit No. 18-184 - Extension to the Expiry Date

  • Location (Burnaby, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80533
  • Last Modified: 2021-04-13
  • Relevance: 778.4
  • The permit holder, Island Tug and Barge Limited, proposes to carry out physical activities related to the installation of eight steel pipe piles up until December 31, 2021. The installation of the piles has been delayed for various reasons and work cannot proceed until after the fisheries sensitive period, therefore, an extension to the permit is required to complete the work in late 2021. This would require an extension to the approved project permit No. 18-184, which currently has an expiry ...

Project Design and Replace Watercourse Crossing at Brown Brook at Browntown Road 5CDSB Gagetown

  • Location (Canadian Forces Base Gagetown, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81521
  • Last Modified: 2021-04-13
  • Relevance: 778.07
  • The project consists of the reinstatement of Browntown Road. This requires the installation of a culvert and repair of associated approach grades. The construction footprint at Browntown Road is expected to remain within the footprint of the impact area from the past road construction and installation and removal of the original culvert. The crossing will be designed to current standards to accommodate existing hydraulic conditions with minimal impact on aquatic habitats. The crossing design ...

Project Watercourse Crossing : Lawfield at Queens, Canadian Forces Base Gagetown

  • Location (Canadian Forces Base Gagetown, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81520
  • Last Modified: 2021-04-13
  • Relevance: 777.85
  • CBCL Limited was contracted by Defence Construction Canada in July 2018 to design upgrades for the replacement three (3) watercourse crossings within the 5th Canadian Division Support Base Gagetown (5 CDSB) Range and Training Area in Oromocto, New Brunswick. The watercourse crossing on Lawfield Road at Otnabog Stream requires replacement as military activities upstream and high water flow have resulted in erosion and structural damage around the inlet and outlets. Additionally, the interior of ...

Project Gilholmes Lake Flow Control Structure

  • Location (Gilholmes Lake, Sydney, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81519
  • Last Modified: 2021-04-13
  • Relevance: 777.73
  • The Cape Breton Regional Municipality (CBRM) is proposing to construct a water flow control structure at the outflow from Gilholmes Lake on the Sydney Rifle Range property owned by the Department of National Defence (DND). The proposed work is a component of the larger Wash Brook Flood Mitigation Project initiated by CBRM following a major flooding event that occurred in Sydney in October 2016. This part of the proposed Project will entail the construction of an earthen berm across the ...

Project Upgrade Storage Tank Systems at Various Locations, Garrison Petawawa

  • Location (Garrison Petawawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81518
  • Last Modified: 2021-04-13
  • Relevance: 777.61
  • Real Properties Operations Detachment Petawawa at Garrison Petawawa is proposing the upgrade of product transfer areas and reassess and upgrade existing conditions at various storage tank locations. The project is required to better meet the intent of applicable present and future regulations and will occur at storage tank systems having capacities over 5000 Litres.

Project Highway 165 Grade Raise near Beauval, SK

  • Location (Beauval, SK, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81517
  • Last Modified: 2021-04-13
  • Relevance: 777.58
  • The Saskatchewan Ministry of Highways (Ministry) desires to complete road work to mitigate future flooding on a roadway near Beauval, Sk. This work consists of a grade raise and associated widening (i.e. notching and extending the side slopes) on the main road with additional surfacing with a base, and asphalt concrete. The majority of the widening will be contained within the existing right-of-way (ROW), however, a small expansion to the existing ROW is required to fit a new embankment. The ...

Project Penticton Airport Parking Lot Rehabilitation and Expansion

  • Location (Penticton Airport, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81508
  • Last Modified: 2021-04-12
  • Relevance: 774.59
  • Transport Canada is proposing to expand and rehabilitate the current airport parking lots at the Penticton Regional Airport to accommodate projected increase in passenger usage.  The existing lot will be reconfigured, two new lots will be developed on areas currently used for overflow parking (mix of grass and gravel area), and additional spaces will be added to the staff parking area.  All lots are expected to include new pavement (approximate total paving of 8440 m2), granular base, ...

Project Pilot project for a trail accessible to visitors with dogs on leash, Multi-Use Trail No. 3. La Mauricie National Park.

  • Location (La Mauricie National Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81516
  • Last Modified: 2021-04-12
  • Relevance: 774.06
  • The objective of the proposed pilot project is to measure the real operational implications and impacts of the introduction of trails where dogs would be allowed on the quality of the visitor experience and on the ecological integrity of La Mauricie National Park, with a view to including in the service offer trails that are accessible to dogs on leash on a permanent basis. It will run for a period of 5 years, from June 21, 2021 to October 31, 2026. Multi-use trail #3 was selected for the pilot ...

Project Near Surface Disposal Facility Project

  • Location (Deep River, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80122
  • Last Modified: 2021-04-12
  • Relevance: 773.24
  • The Near Surface Disposal Facility (NSDF) is a proposed engineered disposal facility for low-level radioactive waste planned for the Chalk River Laboratories site (CRL). All waste to be disposed at the NSDF will be required to meet the waste acceptance criteria established to assure compliance with operational and long-term safety requirements. The Near Surface Disposal Facility is planned to have an operating life of at least 50 years and as proposed, would be an engineered mound built ...

Project Lac la Pêche Sanitary Block - Gatineau Park, lac La Pêche, Municipality of Pontiac, Québec

  • Location (lac la Pêche, Masham, Québec, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81442
  • Last Modified: 2021-04-12
  • Relevance: 772.94
  • Project summary The National Capital Commission (NCC) plans to replace an existing comfort station (which includes a lifeguarding unit) located near the main parking lot entrance to the public beach at Gatineau Park's La Pêche Lake, near Masham in the Municipality of Pontiac, Quebec. The La Pêche Lake beach is a public beach owned and operated by the NCC. The new comfort station is being built because the existing building is at the end of its life cycle. It will be ...

Project Reinforcement of the caissons along berths 50 to 52 at the Port of Montreal

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81506
  • Last Modified: 2021-04-12
  • Relevance: 772.57
  • The project consists of reinforcing the caisson foundations along berths 50 to 52 at the Port of Montreal. This reinforcement is required to ensure the stability of the caissons in the event that these berths are deepened to 11.7m below chart datum. The work will be carried out mainly underwater at the base of the caissons, close to the riverbed. Various reinforcement methods are planned along the berths depending on the anti-washout structure in place at the base of the ...

Project Smallmouth Bass Project

  • Location (Riding Mountain National Park, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81513
  • Last Modified: 2021-04-09
  • Relevance: 761.93
  • Smallmouth bass were detected in Clear Lake by visitors in August, 2020. Smallmouth bass are not native to Clear Lake and may outcompete native species for food and habitat resources. Limiting the establishment of Smallmouth bass is a priority, aimed at minimizing potential impacts to native species and natural ecosystem processes of Clear Lake.

Project Tiger Salamander Crossing

  • Location (Riding Mountain National Park, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81512
  • Last Modified: 2021-04-09
  • Relevance: 761.9
  • To improve connectivity, this project will construct a "salamander crosswalk" for Western Tiger Salamanders across highway 10 near the south entrance to the park. This will involve sloping the curbs along the boulevard and west side of the road and placing signage that encourages drivers to slow down and watch for this important species at risk.

Project Sturgeon Lake First Nation Children's Playgrounds

  • Location (Park location 1, Saskatchewan) (Park location 2) (Park location 3)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81511
  • Last Modified: 2021-04-09
  • Relevance: 761.73
  • The objective of the project is to provide substantive equality to their youth through the development of accessible, safe and modern playground equipment, that provides youth from aged 2 to 16 equal access and opportunity to safe playground areas in the existing residential subdivisions of our community. Project scope includes playground equipment, accessible surfacing, concrete for structures, welding requirements and associated works.

Project West Coast Trail Bridge (#96) Support Repair

  • Location (Pacific Rim National Park Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81510
  • Last Modified: 2021-04-09
  • Relevance: 761.53
  • An impact assessment is required to address potential impacts resulting from the repair of a Class A2 pedestrian bridge on the West Coast Trail of Pacific Rim National Park Reserve. Bridge repairs are required to ensure the safety of visitors and staff while traversing and maintaining the trail. Limited ground disturbance within riparian habitat will be required to upgrade the mid-span bridge support structure. All work within the riparian zone will meet DFO measures to reduce harm to fish, ...

Project Re-Establishing Our Healing Journeys

  • Location (Mississaugas of the Credit First Nation Reserve, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81509
  • Last Modified: 2021-04-09
  • Relevance: 761.26
  • Project Description: The project purpose is to rebuild the administration area that was heavily destroyed by fire and to renovate the residential area damaged by smoke. This portion of the building has been gutted to the studs. This land is currently developed, cleared, with access to local services - water, sewer, natural gas, hydro and telephone. The design will include a new layout and restoration of the existing building which was damaged by the fire. The proposed expansion area is ...

Project Tent Mountain Mine Redevelopment Project

  • Location (16km west of Coleman (Alberta), Alberta)
  • Assessment Type: Request for designation
  • Status: In progress
  • Reference Number: 81436
  • Last Modified: 2021-04-09
  • Relevance: 760.65
  • Montem Resources Alberta Operations Ltd. is proposing to restart and expand mining operations at the Tent Mountain Mine, an open-pit coal mine located 16 kilometres west of Coleman, Alberta that stopped operating in 1983. As proposed, the Tent Mountain Mine Redevelopment Project would expand the original mine pits to allow for the production of 4925 tonnes per day of raw coal used for steelmaking, over a 14-year mine life. The project would also include a coal handling and processing plant ...