Public Notice

Burlington Lift Bridge - Storage Tank Upgrades - Public Comments Invited

 

July 28, 2021 – PSPC must determine whether the proposed Burlington Lift Bridge - Storage Tank Upgrades, located in Hamilton, Ontario is likely to cause significant adverse environmental effects.

To help inform this determination, PSPC is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online. For more information, individuals should consult the Privacy Notice on the Registry website:

 

https://iaac-aeic.gc.ca/050/evaluations/protection

 

Written comments must be submitted by August 30, 2021 to the contact below. Please include the project title and reference number.

 

Public Services and Procurement Canada

Joseph Nguyen, Environmental Specialist

4900 Yonge Street

Toronto, Ontario M2N 6A6

Telephone: 437-992-4353

Email: Joseph.Nguyen@pwgsc-tpsgc.gc.ca

 

 

The Proposed Project

 

The storage tank system will be upgraded to bring it into compliance. Upgrades to include replacing main tank, repairing the concrete secondary containment, adding a second day tank, replacing the pump system, adding a manual shutoff valve to the supply line, installing redundant level-control system on both day tanks, replacing the suction piping of the transfer duplex pumps and provide effective corrosion protection on new piping, adding pressure relief piping from the duplex pumps to the main tank and installing a liquid tight 150 mm high sill around all the fuel installations in the service room.

Document Reference Number: 1

Date modified: